The Ijaw Youth Council (IYC) Worldwide has rejected reports that the Federal Government plans to divert the 750km Lagos-Calabar Coastal Highway from Ondo State to the East-West Road, a move that would cut off Edo, Delta, Bayelsa and Rivers States.
The 10th National Executive Committee of the IYC, led by Dr. Doubra Okotete, made the position known at a press conference held in Yenagoa on Wednesday, October 15, 2026.
The group called on President Bola Tinubu to direct the Minister of Works, Engr. David Umahi, to adhere to the original design approved by the Federal Executive Council (FEC).
The IYC said it was shocked by statements attributed to the Minister that the highway would be merged with the East-West Road after Ondo State, describing the purported excuse of financial constraints and difficult terrain as “insulting, provocative and unacceptable.”
The group said it was unjust to claim the project is too expensive to execute in the region that produces over 85 percent of the nation’s wealth.
“How can a project be too expensive or its terrain too difficult in the very region that produces the oil and gas that funds the entire Federation Account, funds the Lagos-Ibadan Expressway, funds the Sokoto-Badagry Highway, funds the Abuja-Kaduna Highway?”
“We therefore refuse to be shortchanged in this one project that is meant to directly benefit us.
“Our oil must not be used to develop other regions while our region is told that developing our area is too costly,” it added.
The group argued that the diversion idea came only after the road had covered the President’s native South-West and the Cross River/Akwa Ibom axis,” the council said.
The IYC also faulted former Cross River State Governor, Donald Duke, for reportedly saying on national television that continuing the highway through the Niger Delta swamps was not feasible.
Countering Duke, the Council said South-South states are already executing similar projects in more difficult terrain despite limited resources.
It listed Bayelsa’s 21km Nembe-Brass Road with over 15 bridges across Atlantic swamps, the Yenagoa-Oporoma-Ukubie Road with a 630-metre bridge across the Nun River, the Ekeremor-Agge Road leading to the proposed Agge Seaport, the Polaku/Sabagria Road, and the dualised Glory Drive Phases 1, 2 and 3.
It also cited Rivers State’s Trans-Kalabari Road, the NDDC’s Port Harcourt-Okrika Road with the 1.2km Kaa-Ataba Bridge, the 27.1km Bonny Ring Road with over 13 bridges, and Delta State’s 24km Gbaregolor-Ogolaha legacy road linking over 10 coastal communities.
To prove its point, the IYC offered to sponsor a fully funded tour for Duke to Bayelsa, Rivers and other parts of the South-South to see ongoing projects in the so-called difficult terrain.
The Council warned that diverting the highway would damage the political fortunes of President Tinubu and the ruling All Progressives Congress (APC) in the South-South ahead of the 2027 elections.
It noted that Governors Douye Diri, Sheriff Oborevwori of Delta and Siminalayi Fubara of Rivers defected to the APC partly because of promises of legacy projects like the coastal highway.
The IYC also dismissed the subsequent disclaimer issued by the Minister of Works as unconvincing, describing it as “calculated deceit” ahead of the January 2027 presidential election.
It therefore demanded that the federal government publish the approved designs and engineering drawings of the entire 750km highway and direct the contractor to immediately commence work simultaneously on the Rivers/Bayelsa/Delta/Edo axis alongside the Lagos-Ondo and Cross River-Akwa Ibom axes.
The Council maintained that while Ijaw people remain peaceful, hospitable and accommodating, unguarded statements and ill-advised decisions on the coastal highway could have unintended consequences for the President and his party in the region.
“The Minister of Works should be properly guided in his decisions and utterances on serious national topics. Unguarded statements on the coastal highway may bring out unintended consequences that will directly affect the political appeal and acceptance of Mr. President and his party in the South-South, particularly as the 2027 general elections fast approach,” it warned.
