Minister of Power, Joseph Tegbe, says some Nigerians have asked him to slow down on power improvements because their freezers are now working non-stop.
Tegbe disclosed this on Wednesday in Abuja at the commissioning of the 3-megawatt solar hybrid power project at Yakubu Gowon University, formerly University of Abuja.
According to him, areas that previously had no electricity for three months are now enjoying up to 18 hours of supply daily.
“Places that didn’t have light at all for three months are now having 18 hours light. Some areas called me to say, look, I should slow down, that everything in their freezer is freezing.
“That is what freezer is meant to do. Let it freeze the food that needs to be frozen,” the minister said.
He recalled that during his Senate screening, he promised Nigerians would see noticeable improvements in electricity supply within three to six months.
Tegbe, however, admitted that the sector still faces major challenges, noting that some power infrastructure is over 40 years old and is being systematically replaced.
He also lamented the rising vandalism of electricity infrastructure, revealing that three major transmission towers in Birnin Kebbi were recently brought down by vandals.
The towers, he said, supply power to Kebbi State and extend to Niger Republic. The vandals reportedly destroyed the foundations before cutting parts of the structures for scrap.
“You will not believe how many towers get pulled down by vandals,” Tegbe said.
He said the Federal Government has set up a joint committee involving the Economic and Financial Crimes Commission, EFCC, the Nigeria Police and the Nigeria Security and Civil Defence Corps, NSCDC, to protect national electricity assets and ensure vandalism is treated as a serious criminal offence.
On the university project, Tegbe said the 3.3-megawatt solar array with 3MW AC output and battery storage will power lecture halls, laboratories, ICT facilities, administrative buildings and campus lighting.
He said 58,726 students are expected to benefit from the project, which has 6,078 photovoltaic panels and 388 streetlights, and created 3,201 jobs during implementation. The battery storage can be expanded to cover hostels.
The Rural Electrification Agency, REA, will work with the university to improve lighting in other parts of the campus, he added.
He urged the university to use the facility for research in renewable energy, battery storage, smart metering, energy management and grid integration.
